Govt cuts pipeline project losses to RM3bil, reallocates RM5bil to water projects政府将管道项目亏损削减至30亿令吉,并将50亿令吉重新分配给水利项目。
KUALA LUMPUR: The government has reduced its losses from the termination of the Multi-Product Pipeline (MPP) and Trans-Sabah Gas Pipeline (TSGP) projects to RM3 billion by reallocating RM5 billion in loans to finance water supply projects in northern Perak and Penang.
KUALA LUMPUR: The government has reduced its losses from the termination of the Multi-Product Pipeline (MPP) and Trans-Sabah Gas Pipeline (TSGP) projects to RM3 billion by reallocating RM5 billion in loans to finance water supply projects in northern Perak and Penang.
Prime Minister Datuk Seri Anwar Ibrahim said an agreement between Suria Strategic Energy Resources Sdn Bhd (SSER) and the Export-Import Bank of China (CEXIM) to reallocate the RM5 billion loan was signed on Oct 30.
Thank you for your report!
Trans-Sabah gas pipeline, multi-product pipeline projects, border security among Dewan Rakyat focus today
PM: Govt still faces RM3bil loss from failed pipeline projects despite RM5bil deal with China
99 Speed Mart growth intact
吉隆坡:政府已将因终止多产品管道(MPP)和跨沙巴天然气管道(TSGP)项目而造成的损失减少至30亿令吉,方法是将50亿令吉的贷款重新分配给霹雳州北部和槟城的供水项目。
首相拿督斯里安华·易卜拉欣表示,Suria Strategic Energy Resources Sdn Bhd (SSER) 与中国进出口银行 (CEXIM) 于 10 月 30 日签署了重新分配 50 亿令吉贷款的协议。
感谢您的报告!
今天下议院的重点议题包括跨沙巴天然气管道、多产品管道项目和边境安全。
首相:尽管与中国达成50亿令吉协议,政府仍面临因管道项目失败而造成的30亿令吉损失。
99速卖通的增长势头依然强劲