← 返回新闻首页
马来西亚主流

TNB takes the charge — and the cost

For much of the past two years, Tenaga Nasional Bhd (TNB) has almost been synonymous with Malaysia's data centre (DC) boom.

The Star MalaysiaGURMEET KAUR查看原文 ↗
TNB承担费用及相关成本

FOR much of the past two years, Tenaga Nasional Bhd (TNB) has almost been synonymous with Malaysia’s data centre (DC) boom.

The logic is straightforward: artificial intelligence, cloud computing and hyperscale DCs require enormous amounts of electricity, putting the utility group at the centre of the infrastructure needed to support the country’s rapid expansion as a regional DC hub.

Already a subscriber? Log in

Get 20% OFF The Star Digital Access

Cancel anytime. Ad-free. Unlimited access with perks.

RM 13.90/month RM 11.12 /month

Billed as RM 11.12 for the 1st month, RM 13.90 thereafter.

RM 12.33/month RM 9.87 /month

Billed as RM 118.40 for the 1st year, RM 148 thereafter.

Thank you for your report!

TNB takes the charge — and the cost

Oil windfall — with a catch

手机左右滑动,电脑按 ← → 键,也能切换新闻