Penang’s Jalan Magazine slip road to face periodic closures from Oct 14 until Feb 21 next year for Mutiara Line LRT works槟城 Jalan Magazine 匝道将于 10 月 14 日至明年 2 月 21 日期间因珍珠线轻轨工程而间歇性封闭。
GEORGE TOWN, Oct 13 — Part of the route along Jalan Magazine here will be closed periodically for 131 days starting tomorrow to make way for construction work on the Mutiara Line...

Part of Jalan Magazine will be closed periodically for 131 days starting from 10am tomorrow for Mutiara Line LRT construction work.
The closure affects the slip road from Lebuh McNair near 1st Avenue Mall towards Jalan Magazine up to Hotel Jen, but other routes remain open.
Motorists are advised to be cautious, with safety measures including signboards, traffic cones, and flagmen in place.
GEORGE TOWN, Oct 13 — Part of the route along Jalan Magazine here will be closed periodically for 131 days starting tomorrow to make way for construction work on the Mutiara Line Light Rail Transit (LRT) Project.
In a statement today, Malaysia Rapid Transit Corporation Sdn Bhd (MRT Corp) said the long-term closure will start from 10am tomorrow and continue until 5am on February 21, 2027.
“The closure involves the slip road from Lebuh McNair near 1st Avenue Mall towards Jalan Magazine up to the front of Hotel Jen heading towards Komtar.
“However, other routes will remain open for traffic use,” the statement read.
MRT Corp said the closure will facilitate construction work on the Mutiara Line LRT Project under Package CMC1, including road widening and utility relocation works.
Motorists are therefore advised to exercise caution when passing through the area. Signboards, traffic cones and flagmen will be stationed at the location to manage traffic and ensure safety. — Bernama
Malaysia’s semiconductor exports remain exempt from US tariffs, says Johari Ghani
Fadhlina: Schools in Johor, Melaka, Negeri Sembilan and nine districts to close tomorrow as haze lingers
Zahid: Malaysia and China ramp up fight against cyber scams, cross-border crime
从明天上午 10 点开始,Jalan Magazine 的部分路段将因 Mutiara Line 轻轨建设工程而间歇性封闭 131 天。
此次封闭路段影响从 1st Avenue Mall 附近的 Lebuh McNair 通往 Jalan Magazine 并延伸至 Hotel Jen 的匝道,但其他路线仍然开放。
建议驾驶员谨慎驾驶,现场已采取安全措施,包括设置标志牌、交通锥和交通指挥员。
乔治市,10 月 13 日讯——从明天开始,乔治市 Jalan Magazine 的部分路段将间歇性封闭 131 天,以便为珍珠线轻轨交通 (LRT) 项目的建设工作让路。
马来西亚捷运公司(MRT Corp)今天发表声明称,长期关闭将于明天上午 10 点开始,一直持续到 2027 年 2 月 21 日凌晨 5 点。
“此次封闭路段包括从 Lebuh McNair 靠近 1st Avenue Mall 到 Jalan Magazine 的匝道,一直到 Hotel Jen 前面,通往 Komtar 方向。
声明中写道:“但是,其他路线仍将保持开放,供车辆通行。”
MRT Corp表示,此次道路封闭将有利于珍珠线轻轨项目CMC1标段的建设工作,包括道路拓宽和公用设施搬迁工程。
因此,建议驾驶者在经过该区域时谨慎驾驶。现场将设置指示牌、交通锥和交通指挥员,以疏导交通并确保安全。——马新社
马来西亚半导体出口仍免征美国关税,Johari Ghani表示。
Fadhlina:雾霾持续,柔佛、马六甲、森美兰和九个地区的学校明天停课
扎希德:马来西亚和中国加大力度打击网络诈骗和跨境犯罪