UUE Holdings forms JV for power grid infrastructure businessUUE控股公司成立合资企业,进军电网基础设施业务
PETALING JAYA: UUE Holdings Bhd, via its wholly-owned subsidiary Kum Fatt Engineering Sdn Bhd has entered into a joint venture agreement with EGP Infrastructure Investments Pte Ltd (EGPII) for the formation of a joint venture (JV) company to undertake the business of construction, development and delivery of power grid infrastructure.
PETALING JAYA: UUE Holdings Bhd , via its wholly-owned subsidiary Kum Fatt Engineering Sdn Bhd has entered into a joint venture agreement with EGP Infrastructure Investments Pte Ltd (EGPII) for the formation of a joint venture (JV) company to undertake the business of construction, development and delivery of power grid infrastructure.
In a filing with Bursa Malaysia, UUE said this includes, amongst others, the supply and installation of extra-high-voltage (no less than 132 kilovolts and up to 500 kilovolts) electrical equipment and materials including transformers, switchgear, cables, and associated accessories, the construction and commissioning of transmission and distribution systems.
Thank you for your report!
Corporate Malaysia beats the war blues
YTL Power and Ganda Power secure four additional Siemens Energy gas turbine units
Robust 2Q keeps corporate growth on track
八打灵再也:UUE Holdings Bhd 通过其全资子公司 Kum Fatt Engineering Sdn Bhd 与 EGP Infrastructure Investments Pte Ltd (EGPII) 签订合资协议,成立一家合资公司,从事电网基础设施的建设、开发和交付业务。
UUE在提交给马来西亚证券交易所的文件中表示,这其中包括供应和安装超高压(不低于132千伏,最高可达500千伏)电气设备和材料,包括变压器、开关设备、电缆和相关配件,以及输配电系统的建设和调试。
感谢您的报告!
马来西亚企业战胜了战争阴霾
YTL Power 和 Ganda Power 又订购了四台西门子能源燃气轮机。
强劲的第二季度业绩使公司增长保持正轨