← 返回新闻首页
国际军事专业

Navy Identifies EA-18G Growler As Type Involved In Mishap Aboard USS Dwight D. Eisenhower Last Night

The failure of an arresting wire is one of the worst nightmares for naval aircrew and sailors working on the flight deck.

TWZHoward Altman, Ian Ellis-Jones查看原文 ↗
海军确认昨晚在“德怀特·D·艾森豪威尔”号航空母舰上发生的事故所涉飞机型号为EA-18G“咆哮者”电子战飞机。

By Howard Altman , Ian Ellis-Jones

Published Sep 29, 2026 2:33 PM EDT

(U.S. Navy photo by Mass Communication Specialist 3rd Class Nathan T. Beard/Released)

The Navy has identified the aircraft type at the center of last night’s mishap aboard the aircraft carrier USS Dwight D. Eisenhower . The service said the incident involved the crew of an EA-18G Growler electronic warfare jet forced who were forced to eject after the aircraft experienced an arresting gear failure while trying to land. This took place about 6:18 p.m. Eastern Daylight Time Monday as the vessel was off the coast of Virginia.

The Growler crew, attached to the “Zappers” of Electronic Attack Squadron (VAQ) 130, was “promptly recovered by search-and-rescue personnel assigned to Helicopter Sea Combat Squadron (HSC) 7. Both aviators were safely returned to the ship,” the Navy added. The cause of the mishap is still being investigated.

A U.S. Navy F/A-18F Super Hornet approaches the flight deck of Nimitz class aircraft carrier USS Dwight D. Eisenhower (CVN 69), June 20, 2026. Eisenhower is underway in the Atlantic Ocean conducting carrier qualifications, supporting East Coast fleet replacement squadrons. (U.S. Navy photo by Mass Communication Specialist 2nd Class Miguel Santiago) Petty Officer 2nd Class Miguel Santiago

The two aviators and two additional sailors injured on the flight deck were flown to Naval Medical Center Portsmouth for follow-on evaluation, the Navy explained. Another sailor was flown to a Norfolk-area hospital for treatment of non-life-threatening injuries. All told, eight sailors had to be evaluated by the ship’s medical personnel following the incident.

Air traffic control audio has emerged indicating that the injured sailor flown to the area hospital was transported to Sentara Norfolk General Hospital .

DSTY613 (MH-60S) brought the injured into Sentara Norfolk General Hospital last night. 🙏 Audio via @liveatc and tracking via @ADSBex https://t.co/V1o0nyB70R pic.twitter.com/hmNLb0fcQN — Thenewarea51 (@thenewarea51) September 29, 2026

DSTY613 (MH-60S) brought the injured into Sentara Norfolk General Hospital last night. 🙏 Audio via @liveatc and tracking via @ADSBex https://t.co/V1o0nyB70R pic.twitter.com/hmNLb0fcQN

It is unclear at the moment whether the aircraft was lost or if there was any damage to the carrier itself. We have reached out to the Navy to find out more details.

The failure of an arresting wire is one of the worst nightmares carrier-based fixed-wing naval aircrews and sailors on deck can face. The wire turns into a falling steel whip that can cut a person in half as it slices through the air across the flight deck, and usually, the aircraft it broke away from, ends up in the sea as it doesn’t have enough airspeed or time to get airborne again. You can read more about this type of mishap in our past reporting here .

The mishap took place as Eisenhower was working up in preparation for a future deployment scheduled for 2027, which TWZ previously reported . This followed an extended 16-month Planned Incremental Availability (PIA) that wrapped in April. The carrier had been pierside at Naval Station Norfolk since Sept. 2 after completing a 12-day underway for Fleet Replenishment Squadron and Training Command Carrier Qualifications in the Virginia Capes and Jacksonville Operating Areas.

U.S. Navy Nimitz class aircraft carrier USS Dwight D. Eisenhower (CVN 69) conducts a full power demonstration during Sea Trial in the Virginia Capes, Apr. 22, 2026. Eisenhower returned to sea and is now in the Basic Phase in the Optimized Fleet Response Plan. (U.S. Navy photo by Mass Communication Specialist Seaman Nicole Schweigert) Seaman Apprentice Nicole Schweigert

Eisenhower got underway again on the afternoon of Sept. 28, according to ship spotters, for a Tailored Ship’s Training Availability and Final Evaluation Problem. That’s one of the final steps before onloading ammunition for the Composite Unit Training Exercise, when the full strike group gathers to complete pre-deployment training.

Contact the author: howard@twz.com

Comments couldn’t be loaded. Please refresh the page.

手机左右滑动,电脑按 ← → 键,也能切换新闻